Browser-based product simulation
Run a production shift in under five minutes.
Use realistic sample data to start a job, record hourly production, log downtime, review quality, and see supervisor KPIs update instantly.
No login or customer data required. This is a guided simulation.
Operator sign in
Choose the sample operator profile and enter the demo plant.
ROLE-BASED EXPERIENCE
One connected workflow from operator to leadership.
- Operator-friendly production entry
- Real-time supervisor visibility
- Plant-wide performance intelligence
SHIFT OVERVIEW
Good morning, Avery.
Here is the current state of the demo plant.
JOB CONTROL
Start production job
Work instructions and targets are loaded from approved master data.
Inspect first piece and verify dimensions before full production.
DIGITAL DAY-BY-HOUR
Production Entry — J-10458
Current production hour is selected automatically.
Record hourly results
| Hour | Target | Good | Scrap | Status |
|---|---|---|---|---|
| 06–07 | 120 | 118 | 2 | 98% |
| 07–08 | 120 | 124 | 0 | 103% |
| 08–09 | 120 | 119 | 1 | 99% |
| 09–10 | 120 | — | — | Current |
LOSS CAPTURE
Record downtime event
Standardized reason codes make production losses measurable.
Changeovers represent 39% of today's downtime. Review setup sequence on Press 07.
QUALITY INTELLIGENCE
First-pass quality
Connect scrap and rework to jobs, machines, operators, and reasons.
Target: 97.0% ▲ Above target
Press 14 first-piece checkCompleted • 09:07
Trim 03 inspection holdAssigned to Quality
Material lot verificationResolved • 08:42
SUPERVISOR COMMAND CENTER
Shift performance at a glance
Focus attention on the machines and jobs that need it most.
| Rank | Operator | Department | Attainment |
|---|---|---|---|
| 1 | Jordan Lee | Press | 106% |
| 2 | Avery Johnson | Press | 99% |
| 3 | Morgan Davis | Trim | 97% |
| 4 | Sam Patel | Preform | 94% |
Production savedPress 14 • J-10458
Downtime resolvedPress 07 • Changeover
Target exceededPress 22 • 106%
Quality alert assignedTrim 03 • Inspection
REPORTING & ANALYTICS
Turn plant activity into decisions
Filter, compare, and export trusted operational data.
You completed the Manufacturing Copilot demo.
You started a job, recorded production, captured downtime, reviewed quality, and monitored the shift from a supervisor view.